The Challenge
Our client was struggling with manual handling bottlenecks in their high-volume metal stamping line, leading to inconsistent cycle times.
The Solution
Prodmast implemented a synchronized robotic palletizing and feeding system integrated with their existing presses.
The Result
The facility saw a 40% reduction in cycle time and a significant decrease in material waste.